Skip to content Skip to footer

See the work

Photos from our factory and sites. Frames roll-formed on our own FrameCAD line; structural steel fabricated and installed by our crew.

Quote checklist

What to send for a fast quote

The more of this we get up front, the sooner the written price comes back. Missing something? Send what you have and we will tell you what we need.

Get a quote
  1. Floor plan and elevations — PDF or DWG. A photo of a sketch is fine to start.
  2. Site plan or address — for wind and site class.
  3. Engineering — send us the engineering. It doesn’t matter if your frames are engineered for timber; we can assist in converting them to LGS.
  4. What you need — wall frames, roof trusses, floor joists, structural steel, or the lot.
  5. Supply only, or supply and install
  6. Timing — when you need frames on site.

Quick answers

Common questions

Are steel frames more expensive than timber?
Usually line-ball on the frame and cheaper on the job: straight, pre-labelled, faster to stand, less waste.

Termites and fire?
Steel is not a food source and is non-combustible. No treatments, no barriers to maintain.

Will it be strong enough?
Every frame is engineered for the site and signed off before it is made.

How long does it take?
Written quote in 1–3 business days. Production typically 4–6 weeks from approval.

Do you install?
Yes. Supply only, or supply and install with our own crew and a certificate at handover.

Warranty?
30-year structural warranty on our frames.

Design, Build and Innovate

Ramco Steel is a proudly Australian owned company that thrives on its commitment to excellence.

Office

Factory 2, 1-3 Ashley Park Drive
Chelsea Heights VIC 3196

Got plans? Get a price

Send us your drawings (PDF, DWG or a photo) and we will come back with a written quote. Steel framing and structural steel, made in Melbourne.

Get a quoteOr call (03) 9070 0101

©2023 Ramco Steel. All Rights Reserved.

Get a Quote